Bay Ltd. Fabricates and Loads Out Six Modules at Bay North Yard in Aransas Pass, TX
Load out day for six Pre-Assembled Racks totaling 1,600 tons destined for a US Gulf Coast refinery. Our fabrication team was able to test fit these 100 foot long modules inside our shop at the Bay North Yard before handing over to our heavy haul...
Read More