Corporate Offices


Other Locations
Colombia
Canada
Tennessee Pipeline
Three Rivers Oilfield Services Center
 

Other Services

Bay Ltd.’s other services include a number of specialized areas. Our additional offerings include:

Tennessee Pipeline

Pipeline Construction and Terminal Support (TPCC)

Since 1963 Tennessee Pipeline Construction Company (TPCC) has provided customers support with work activities that include: dock and tank farm infrastructure installation and maintenance, terminal operations support, API 1104 pipe fabrication and installation to 48″ including manifolds, headers, and associated tie-ins, operated heavy equipment support, underground piping and conduit installation or repair, grounds and lawn maintenance, right-of-way maintenance including vegetarian removal, face installation and repair, painting and signage.

Our TPCC division offers the following services:

  • Cross Country Pipeline Installation
  • Industrial Pipeline Installation
  • Pipeline Maintenance Services
  • Terminal Facilities
  • Horizontal Directional Drilling

Eagle Ford Support Services Center (TROSC)

The Three Rivers Oil Field Service Center (TROSC) is located on the Union Pacific rail line, just north of Three Rivers, TX in the heart of the Eagle Ford Shale. Our 600-acre, 24-hour full service facility includes one of the largest rail terminals in the region, providing clients with an convenient drop point for service in logistics and materials management. The TROSC property provides customers and tenants with storage & laydown for the temporary staging and storing of tubular goods, liquid and dry bulk materials, oilfield equipment and crude oil products. In addition, TROSC has a full team onsite prepared to assist in any material handling and distribution needs around the clock.